Maintenance on Student Centre elevators will temporarily reduce operations

Please be advised that regular maintenance has been scheduled for the Student Centre elevators.

Maintenance is scheduled to begin this week and last for 6-8 weeks. One elevator will always be operational during maintenance; however, the reduced operations may result in delays.

We encourage those who can to use the stairwells within the building to help alleviate delays and ensure those who need an elevator can access it in a timely manner.

 As part of this work, equipment will be lifted to the roof requiring a brief closure of the loading area behind the Student Centre during that time. Facilities Management will work with Aramark and SMUSA to coordinate a date and time to reduce the impact of the temporary closure.